August 15, 2007
Loading image. Please wait
Drilling the water well. (8-14-2007)
Drilling the water well. (8-14-2007)
Water from 700' down; purging the bottom of the shaft. (8-14-2007)
Preparing the pump for submersion. (8-15-2007)
Excavated soil from the building pad. (8-15-2007)
Building pad prep; soil is excavated 3' down. It will then be moistened and re-compacted into place. (8-15-2007)
North parking area stripped, staked, and excavated begun. (8-15-2007)
Earthwork is in process on building pad and parking lots.
Earthwork is in process on building pad and parking lots.